  • Studwork

    Creating additional rooms, cupboards, en-suites require building studwork, routing wires & plasterboarding.

    Examples of work:

  • Loft Storage & New Loft Hatch Created

    New larger loft hatch created. Loft joisted out for strengthen support of T&G loft flooring. Creating a spacious storage space with better access.

    Old loft hatch on the landing was small & difficult to access the loft as it falls under the eaves of the roof.

    New flooring timbers fixed on top of main purlin timbers & not to ceiling timbers.

    These new timbers provide the independent support for the T&G loft boards.

  • Garage / Annex Kitchenette & WC

    Kitchenette installed complete with plumbing, sink, worktop & cabinets.

    Inside cabinet below the sink is an Ariston 9 litre water heater, which provides hot water to both the  kitchen & wc sinks.

    Floor tiling throughout the area.

  • Bathroom Upgrade

    • A completely new bathroom created.
    • Large built-in bathtub, framework constructed & bath installed complete with mosaic tile surround.
    • All the plumbing complete with isolation valves to all taps.
    • Wall & floor tiling.
    • Cabinets built & installed.
    • Large quadrant shower cubicle installed complete with tiling.